Subway Line no.5, Bucharest
Designing and building "Subway Line No. 5 - Drumul Taberei - Pantelimon. Section 1. Drumul Taberei - Universitate. Raul Doamnei - Hasdeu(Opera) Segment - Resistance Structure"
- Project description:
The project consists of building 9 subway stations and the 9 mid-subway stations between Raul Doamnei and Hasdeu (Opera), Bucharest. The length of the subway line in this area - subway section 1, is roughly 6 km. All subway stations and tunnels will be performed inside moulded enclosed walls, with an open excavation. The project will be performed by a Joint-Venture between Astaldi S.p.A., FCC Construccion S.A., S.C. DELTA A.C.M. 93 SRL and S.C. AB Construct S.R.L.
The duration of the project is 25 months.
- Beneficiary: S.C. Metrorex S.A.
- Project startup date: ongoing project
- Project completion date: ongoing project